BP South Caucasus Pipeline Expansion Project

There were three distinct packages on this project, firstly to meter gas (MX71 import) entering Georgia at the Azerbaijan border, and then to meter gas as it leaves (MX81 export) Georgia at the Turkish border. The third and final package was supplied for the offtake metering (MS72) within Georgia. Each package employed Orifice meters as the primary measuring device with the design in accordance with ISO.5167.

MX71 Metering Skid Assembly